Auusda 16" Business Laptop, Windows 11 Pro Computer, Intel Core i3 1000NG4, 16GB DDR4 RAM 1TB SSD, Backlight, Fingerprint, Webcam, Silver
  •  
  • $329.99 
  • Save: 45%
  • $649.00
  • Free 30-day Returns
  • Price alert
    Sold by Happy Bear
    Top Rated
    4.8 (104 seller ratings)

    Shipped by Happy Bear

    Shop it at NeweggBusiness.

    Meet Your Seller

    HP 15.6" IPS FHD Touchscreen Everyday Laptop Intel core i5-1334U (Beat i7-1255U) 32GB RAM 1TB SSD Intel Iris Xe Graphics HDMI USB-C Long battery life AI Copilot Windows 11 Pro Silver | Cooling Fan

    Limited time offer, ends 11/08 By Happy Bear

    • 8GB RAM | 512GB SSD | Win 11 Home
    • 16GB RAM | 512GB SSD | Win 11 Home
    • 16GB RAM | 1TB SSD | Win 11 Home
    • 16GB RAM | 2TB SSD | Win 11 Home
    • 32GB RAM | 512GB SSD | Win 11 Home
    • 32GB RAM | 1TB SSD | Win 11 Home
    • 32GB RAM | 2TB SSD | Win 11 Home
    • 64GB RAM | 1TB SSD | Win 11 Home
    • 64GB RAM | 2TB SSD | Win 11 Home
    • 8GB RAM | 512GB SSD | Win 11 Pro
    • 16GB RAM | 512GB SSD | Win 11 Pro
    • 16GB RAM | 1TB SSD | Win 11 Pro
    • 16GB RAM | 2TB SSD | Win 11 Pro
    • 32GB RAM | 512GB SSD | Win 11 Pro
    • 32GB RAM | 1TB SSD | Win 11 Pro
    • 32GB RAM | 2TB SSD | Win 11 Pro
    • 64GB RAM | 1TB SSD | Win 11 Pro
    • 64GB RAM | 2TB SSD | Win 11 Pro
    • [Processor] 13th Gen Intel Core i5-1334U 1.30GHz Processor (Up to 4.6 GHz, 12MB Cache, 10-Cores, 12-Threads, 2 Performance-cores)
    • [Display] 15.6" IPS Full HD (1920x1080) 16:9 60Hz Touchscreen Anti-glare Display
    • [Memory and Storage] 32GB DDR4 3200MHz RAM; 1TB PCIe Gen 4 NVMe M.2 SSD
    • [Operation System] Windows 11 Pro
    • [Feature] Intel Iris Xe Graphics; 720p Webcam; Wi-Fi 6, Bluetooth 5.3; Up to 11 hr battery life; 2x USB-A, 1x USB 3.2 Type-C; 1x HDMI 2.1, 1x Headphone/Microphone Combo Jack; 45W Power Supply, 3-Cell 41 WHr Battery; 14.17 x 9.29 x 0.73 inches; 3.52lbs
    +
    +
    Overview
    Specs
    Reviews
    avatar

    Any questions? Our AI beta will help you find out quickly.

    We offer a wide selection of notebooks, 2-in-1 laptops, gaming laptops, and tablets, all with optional upgrades and customizations to suit your needs. If you choose upgrades, the original manufacturer packaging will be opened to professionally install the enhancements according to your specifications. Every device undergoes rigorous testing and inspection to ensure quality and performance before shipping.

    Display: 15.6" IPS Full HD (1920x1080) 16:9 60Hz Touchscreen Anti-glare Display
    RAM: 32GB DDR4 3200MHz SO-DIMM
    Hard Drive: 1TB PCIe Gen 4x4 SSD (Solid State Drive)
    Operating System: Windows 11 Pro -64
    Processor: Intel Core i5-1334U 1.30GHz Processor (13th Gen, upto 4.6 GHz, 12MB Cache, 10-Cores, 12-Threads, 2 Performance-cores)
    Graphics Card: Intel Iris Xe Graphics
    Connectivity: Bluetooth 5.3; Wi-Fi 6
    Ports/Slots: 2 x USB 3.2 (Type-A), 1 x USB 3.2 (Type-C), 1 x HDMI 2.1, No Optical Drive, Headphone/Microphone Combo Jack
    Other Features: Integrated 720p Webcam
    Battery: 45W Power Supply, 3-Cell 41 WHr Battery
    Color: Natural Silver
    Product Dimensions (WxLxH): 14.17 IN x 9.29 IN x 0.73 IN
    Weight: 3.52 lb

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • Read full details
    • CONTACT

    Return Policies

    • Return for refund within: 30 days
    • Return for replacement within: 30 days
    • This item is covered by Happy Bear Return Policy

    Manufacturer Contact Info

    LOADING...