






Any questions? Our AI beta will help you find out quickly.
No-Drill Installation Steps
1.Clean the Wall Surface
Wipe the wall thoroughly with a clean towel to remove dust, grease, and moisture, ensuring a smooth and dry mounting surface.
2.Apply the Solid Adhesive Glue
Evenly apply a thick layer of high-strength solid adhesive glue to the back of the holders mounting plate.
3.Press & Secure with Auxiliary Sticker
Firmly press the holder onto the prepared wall surface, then attach the auxiliary sticker to keep it in place and prevent shifting.
4.Wait for Full Curing
Leave the holder undisturbed for 48 hours to allow the adhesive to fully cure and achieve maximum bonding strength. After this period, the installation is complete and ready for use.