Skip to main content
  • $26.99
  • Free 30-day Returns
  • Sold by CQ Shop

    Shipped by CQ Shop

    Price alert
    Shop it at NeweggBusiness.

    Meet Your Seller

    Garden Flag Holder with Shepherds Hook,Double S Curve Design Garden Flag Stand with 5 Prong Base,Yard Flags Holder with Clip and Spring Stoppers (No Flags) for House,Yard Decorations Outdoor

    • Garden Flag Stand: This upgraded flag pole holder for outside house uses a solid 5-fork base design,with 1 wind clip and 2 spring stoppers.Using this flag pole can help you to fix the garden flag,very suitable for outdoor garden decorations,yard decorations,lawn decorations.Flag holder can not only decorate the garden,but also protect your flag and house for you,you do not have to worry about the safety of the flag
    • Easy to Use: The package includes 4 pieces of pole that you can easily assemble into a complete yard flag holder. And according to the installation instructions,even women can install it in 1 to 2 minutes.The product is also very easy to use,the 5-fork base is the tip,after installation just insert the tip into the lawn,and then decorate the flag you like
    • Garden Flag Holders for Outside : This flag pole holder for outside house uses a 5-fork base stable design,enhanced the stability of the flagpole.The upgraded version of the flagpole base is more stable than the traditional 2-fork base.Even in wind and rain,this small garden flag holder can effectively protect your flag from blowing away
    +
    +
    Overview
    Specs
    Reviews
    avatar

    Any questions? Our AI mode will help you find out quickly.

    Product description

    More Quality Options~~

    Garden Flag Stand

    Add to Cart

    Shepherd Hooks Flag Pole

    Add to Cart

    Windmill Bird Repellent

    Add to Cart

    Flameless Candles

    Add to Cart

    Garden Flag

    Add to Cart

    Thin Blue Line Flag

    Add to Cart

    Wreath Hanger

    Add to Cart

    Customer Reviews

    4.3 out of 5 stars 232

    4.3 out of 5 stars 232

    2.8 out of 5 stars 11

    4.4 out of 5 stars 6

    4.4 out of 5 stars 30

    4.4 out of 5 stars 30

    5.0 out of 5 stars 4

    Price

    $9.99$9.99 $13.99$13.99 $12.99$12.99 $7.99$7.99 $4.99$4.99 $4.99$4.99 $5.99$5.99

    Size

    38.4 X14.6 in 50.4 x 14.7 in 16 x 13 in 1.8 x 1.5 in 12x18 in 12x18 in 12 in

    Package Includes

    1 pack 1 pack 2 packs 24 packs 1 pack 1 pack 1 pack

    Material

    Antirust coated iron Antirust coated iron Stainless steel Plastic+Led Nylon Polyester Metal

    Scope of Application

    Outdoor Outdoor Outdoor Indoor\Outdoor Outdoor Outdoor Indoor

    Decorations

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    • Return for refund within: 30 days
    • Return for replacement within: non-replaceable
    • This item is covered by CQ Shop Return Policy

    Manufacturer Contact Info

    LOADING...