Skip to main content
  • $433.44
  • Free 30-day Returns
  • Sold by Direct from manufacturertuphen

    Shipped by Direct from manufacturertuphen

    Price alert
    Shop it at NeweggBusiness.

    Meet Your Seller

    Old Sku: W2231P261287 LY-025S Curved Loveseat White Full Compression Sponge Sofa, 30D Chenille No-Assembly Compact Sofa for Small Spaces & Apartments, 65"L, 300 lbs, 3 Pillows

    • Compact and practical design: Perfect for corners and studio apartments
    • Luxurious Chenille Fabric: Velvet-soft upholstery resistant to pilling and daily wear.
    • 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
    • Includes 3 Decorative Pillows: Standard 13.39" × 13.39" (34 × 34 cm) pillows complement the sofa's design.
    • Sofa Dimensions: 65" L × 39.1" W × 25.2" H
    +
    +
    Overview
    Specs
    Reviews

    Any questions? Ask CelesteSM will help you find out quickly.

    Compact and practical design: Perfect for corners and studio apartments
    Luxurious Chenille Fabric: Velvet-soft upholstery resistant to pilling and daily wear.
    30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
    Includes 3 Decorative Pillows: Standard 13.39" × 13.39" (34 × 34 cm) pillows complement the sofa's design.
    Sofa Dimensions: 65" L × 39.1" W × 25.2" H

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    • Return for refund within: 30 days
    • Return for replacement within: non-replaceable
    • This item is covered by tuphen Return Policy

    Manufacturer Contact Info

    LOADING...