Skip to main content
  • $53.18
  • Free 30-day Returns
  • Ships from China.
    Price alert
    Shop it at NeweggBusiness.

    Meet Your Seller

    12VHPWR PSU Extension Cable Kit for RTX 50/40 Series, 16AWG Pcie 5.0 Cable Extension Kit Soft Braided 16PIN to 16PIN Cable Kit, 24pin ATX /4+4pin EPS /12+4pin 30CM

    • **Value PSU Extension Cable Bundle**: Includes 2 x 4+4-Pin EPS cables, 1 x 24-Pin ATX cable, and 1 x PCIe 5.0 12VHPWR/12V2X6 12+4-Pin GPU cable, meeting all your PC-building needs.
    • **Designed for RTX 50/40 Series GPUs**: Special 12+4-Pin extension cables, perfectly compatible with RTX 5090, 5080, 5070, 5070 Ti, 4090, 4080, 4080 Super, 4070 TI, 4070 TI Super, 4070 Super, 4070, and other GPUs with 12VHPWR/12+4pin/16pin connections, for a stable connection and exceptional performance.
    • **Premium Materials and Outstanding Performance**: Crafted from 16 AWG copper wire with high density, capable of handling over 1000W modular power supply, and equipped with high-quality alloyed copper connectors supporting up to 600W of power. Ensures stable performance and safety under heavy load conditions.
    • **Terminals of the Highest Quality**: The GPU cable terminals feature highly conductive copper terminals and support a maximum power of 600W. They ensure stable performance and safety under high stress, without image dropouts, screen flickering, or power supply interruptions.
    • **High-Quality PET Sleeves, Enhancing Overall Aesthetics**: The PET-sleeved cables feel robust, are resistant to deformation, and look neat and attractive. This not only simplifies cable management but also enhances the overall appearance of your system.
    +
    +
    Overview
    Specs
    Reviews

    Any questions? Ask CelesteSM will help you find out quickly.

    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR Cable Extension Kit
    12VHPWR PSU Extension Cable Kit for RTX 50/40 Series, 16AWG Pcie 5.0 Cable Extension Kit Soft Braided 16PIN to 16PIN Cable Kit, 24pin ATX /4+4pin EPS /12+4pin 30CM

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    Manufacturer Contact Info

    LOADING...
    LOADING...