Skip to main content
Sold by Audivibe

Shipped by Audivibe

Price alert
Shop it at NeweggBusiness.

Meet Your Seller

Magnum Digital Vibratory Tumbler Brass Polish and Cleaner 050240

Limited time offer, ends 08/13 By Audivibe

  • Magnum Digital Vibratory Tumbler Cleans and polishes large quantities of brass to a brilliant finish, making your finished reloads appear like new. Item 050240. High Capacity The larger drum provides 50% more capacity than the M1 Tumbler. Holds up to (600).38 Special cases, (250) 30-06 cases, or an equivalent amount. Digital Timer Tumble for extended periods (up to eight hours) using the digital timer. Why Tumble? The vibratory action cleans and polishes brass before loading, removing abrasive foreign particles that could scratch the inside of your dies. How to Use Position the included sifter over a 5-gallon bucket (not included) to separate clean brass from the tumbling media. The tumbler bowl is notched for simple sifting and cleanup
+
+
Overview
Specs
Reviews
avatar

Any questions? Our AI beta will help you find out quickly.

Magnum Digital Vibratory Tumbler Cleans and polishes large quantities of brass to a brilliant finish, making your finished reloads appear like new. Item 050240. High Capacity The larger drum provides 50% more capacity than the M1 Tumbler. Holds up to (600).38 Special cases, (250) 30-06 cases, or an equivalent amount. Digital Timer Tumble for extended periods (up to eight hours) using the digital timer. Why Tumble? The vibratory action cleans and polishes brass before loading, removing abrasive foreign particles that could scratch the inside of your dies. How to Use Position the included sifter over a 5-gallon bucket (not included) to separate clean brass from the tumbling media. The tumbler bowl is notched for simple sifting and cleanup

Warranty & Returns

Warranty, Returns, And Additional Information

Warranty

  • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
  • CONTACT

Return Policies

  • Return for refund within: 30 days
  • Return for replacement within: 30 days
  • This item is covered by Audivibe Return Policy

Manufacturer Contact Info

LOADING...