Skip to main content
  • $31.99
  • Free 30-day Returns
  • Sold by PowerixDxz

    Shipped by PowerixDxz

    Price alert
    Shop it at NeweggBusiness.

    Meet Your Seller

    DB2-4G GPS Tracker for Vehicles, Free Trial | Real-Time Vehicle Tracking Device, Car, Van, Motorhome, Easy Battery Install, 4G Fleet Tracking, Low Cost Plan & 7-Day Trial

    • REAL-TIME LIVE GPS TRACKING FOR VEHICLES: Jump into instant location updates with our GPS car tracker. View routes in real time on GPSLive, access a 12-month history and tap into live GPS tracker alerts for unauthorized movement, speed and more.
    • EASY HARDWIRED & MAGNETIC INSTALLATION: Choose between a stealthy hardwire 2-wire connection (ignition sensing via voltage change) or quick attach magnetic GPS tracker for vehicles. Fully hidden GPS tracker for vehicles with no bulky mounts, no exposed wires.
    • INSTANT SMART ALERTS & GEOFENCING: Set up custom zones and receive push/SMS notifications when your tracker device for vehicles enters or exits. Includes ignition on/off, battery disconnect, power loss and trailer tracker movement alerts.
    • SIM INCLUDED & GLOBAL COVERAGE: Pre-installed SIM with data plan ensures your GPS vehicle tracker works coast to coast. Compatible with all 8V-32V systems from cars and trucks to RVs.
    • MULTI-USE: CARS, TRUCKS, MOTORCYCLES, BOATS & TRAILERS: One device does it all: truck GPS tracker, boat GPS tracker, motorcycle tracker, anti theft or personal GPS tracker. Ideal for fleets, family vehicles.
    • AFFORDABLE, FLEXIBLE PLANS + 7-DAY FREE TRIAL: Try it risk-free with a 7-day free trial, then choose a flexible subscription option. $12.49/month for a 12-month plan, or $14.95 a month for 6 months. No contracts, no hidden fees, cancel anytime.
    +
    +
    Overview
    Specs
    Reviews

    Any questions? Ask CelesteSM will help you find out quickly.

    GPS Tracker for Vehicles Compact Efficient
    104 Plus

    DB2 Easy Installation

    Hardwired GPS Tracker A GPS tracking device that is directly connected to a vehicle's power system, allowing continuous power supply and uninterrupted tracking without the need for recharging.
    GPS Module Supports multiple satellite systems: GPS, GLONASS, GALILEO, BEIDOU, SBAS, QZSS, DGPS, AGPS, with up to -165 dBm sensitivity for reliable and precise tracking.
    Accuracy Provides location accuracy of approximately 2 meters.
    Connectivity Technology Utilizes GSM for mobile network communication, Bluetooth for close-range connectivity and GPS for precise location tracking, enabling real-time data transmission and monitoring.
    Supported Application The DB2 4G works with the GPSLive app, providing features like real-time location tracking, geo-fencing, and alert notifications. Users can manage and monitor the tracker remotely through the app.
    Additional Features Includes advanced features such as alert notifications for movement or tampering, an accelerometer for detecting motion or impact, and geo-fencing, which sets virtual boundaries and sends alerts when the vehicle enters or leaves predefined areas.
    Operating Temperature Designed to operate in extreme conditions, from -40°C to +85°C, with up to 95% humidity (non-condensing).
    Working Voltage Operates on 10V – 30V DC and includes overvoltage protection for enhanced safety.
    Power Draw At 12V < 5 mA (Ultra Deep Sleep), At 12V < 9 mA (Deep Sleep), At 12V < 11 mA (GPS Sleep), At 12V < 26 mA (Nominal)
    200 Milliamp Hours Battery Refers to the device's internal battery, which can store up to 200 milliamp hours (mAh) of charge, offering backup power in case of temporary power disconnection from the vehicle.
    Compatible Devices The DB2 4G is compatible with personal computers, tablets, and smartphones, allowing users to access tracking data and manage the device from multiple platforms.
    • Yes, a subscription is required. Flexible plans are available starting from $12.49/month (12-month), $14.95/month, or $79.95 for 6 months. No contracts or hidden fees, and you can cancel anytime.

    • This GPS tracker is compatible with vehicles that have an 8V–32V power supply, including cars, trucks, trailers, RVs, vans, boats, and motorbikes.

    • Yes, the GPSLive app is available for both Android and iOS devices, included with your subscription. Track and manage your device using your smartphone or tablet. On computers, use any web browser with no software installation.

    • Most GPS trackers enter sleep mode when your vehicle is parked to save power. GPSLive will always show the last known location before the tracker went to sleep. The tracker will automatically turn back on once your vehicle starts moving again.

    • Yes, our support team is available to assist you Monday through Saturday from 4 AM to 12 PM Eastern Time (ET). If we are unreachable, please leave a message with your email address and phone number and we will get back to you shortly.

    Explore Our Products

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/d526cfc6-e420-4951-ba04-828d925e6cc0.__AC_SR200,225___.jpg

    DB2 Hard-Wired Tracker

    https://m.media-amazon.com/images/I/417U-6%2BbXvL.__AC_SR200,225___.jpg

    Dual Dashcam GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/f7650529-7e51-4a83-9be7-ebfec103c1d8.__AC_SR200,225___.jpg

    104N GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/f8beaeac-2957-4cdd-b5b2-c52c463d5fc3.__AC_SR200,225___.jpg

    104 Pro GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/7288e929-bd23-47d8-975b-3375bd86817a.__AC_SR200,225___.jpg

    104 Plus GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/9d46a664-b7f5-4fa5-b111-e4453ef3611e.__AC_SR200,225___.jpg

    DB3 4G OBD GPS Tracker

    Customer Reviews
    ——————
    Price
    ——————
    Capacity
    200 Milliamp Hours — 5000 milliamp hours 10000 milliamp hours 20000 milliamp hours —
    Supported Applications
    GPSLive Gpslive, IOS, Android Gpslive, IOS, Android Gpslive, IOS, Android Gpslive, IOS, Android Gpslive, IOS, Android
    Battery Average Life
    — — 35 days 60 days 120 days —
    Product Dimensions
    5.31 x 2.68 x 0.59 inches — 3.35 x 1.93 x 1.18 inches 4.53 x 2.56 x 1.18 inches 4.53 x 2.56 x 1.85 2.56 x 1.85 x 0.87 inches
    Item Weight
    4.6 ounces — 6 ounces 10 ounces 17 ounces 5 ounces
    DB2 4G GPS Tracker for vehicles
    Suitable for private and business use gps tracker

    DB2 Easy Installation

    Hardwired GPS Tracker A GPS tracking device that is directly connected to a vehicle's power system, allowing continuous power supply and uninterrupted tracking without the need for recharging.
    GPS Module Supports multiple satellite systems: GPS, GLONASS, GALILEO, BEIDOU, SBAS, QZSS, DGPS, AGPS, with up to -165 dBm sensitivity for reliable and precise tracking.
    Accuracy Provides location accuracy of approximately 2 meters.
    Connectivity Technology Utilizes GSM for mobile network communication, Bluetooth for close-range connectivity and GPS for precise location tracking, enabling real-time data transmission and monitoring.
    Supported Application The DB2 4G works with the GPSLive app, providing features like real-time location tracking, geo-fencing, and alert notifications. Users can manage and monitor the tracker remotely through the app.
    Additional Features Includes advanced features such as alert notifications for movement or tampering, an accelerometer for detecting motion or impact, and geo-fencing, which sets virtual boundaries and sends alerts when the vehicle enters or leaves predefined areas.
    Operating Temperature Designed to operate in extreme conditions, from -40°C to +85°C, with up to 95% humidity (non-condensing).
    Working Voltage Operates on 10V – 30V DC and includes overvoltage protection for enhanced safety.
    Power Draw At 12V < 5 mA (Ultra Deep Sleep), At 12V < 9 mA (Deep Sleep), At 12V < 11 mA (GPS Sleep), At 12V < 26 mA (Nominal)
    200 Milliamp Hours Battery Refers to the device's internal battery, which can store up to 200 milliamp hours (mAh) of charge, offering backup power in case of temporary power disconnection from the vehicle.
    Compatible Devices The DB2 4G is compatible with personal computers, tablets, and smartphones, allowing users to access tracking data and manage the device from multiple platforms.
    • Yes, a subscription is required. Flexible plans are available starting from $12.49/month (12-month), $14.95/month, or $79.95 for 6 months. No contracts or hidden fees, and you can cancel anytime.

    • This GPS tracker is compatible with vehicles that have an 8V–32V power supply, including cars, trucks, trailers, RVs, vans, boats, and motorbikes.

    • Yes, the GPSLive app is available for both Android and iOS devices, included with your subscription. Track and manage your device using your smartphone or tablet. On computers, use any web browser with no software installation.

    • Most GPS trackers enter sleep mode when your vehicle is parked to save power. GPSLive will always show the last known location before the tracker went to sleep. The tracker will automatically turn back on once your vehicle starts moving again.

    • Yes, our support team is available to assist you Monday through Saturday from 4 AM to 12 PM Eastern Time (ET). If we are unreachable, please leave a message with your email address and phone number and we will get back to you shortly.

    Explore Our Products

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/d526cfc6-e420-4951-ba04-828d925e6cc0.__AC_SR200,225___.jpg

    DB2 Hard-Wired Tracker

    https://m.media-amazon.com/images/I/417U-6%2BbXvL.__AC_SR200,225___.jpg

    Dual Dashcam GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/f7650529-7e51-4a83-9be7-ebfec103c1d8.__AC_SR200,225___.jpg

    104N GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/f8beaeac-2957-4cdd-b5b2-c52c463d5fc3.__AC_SR200,225___.jpg

    104 Pro GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/7288e929-bd23-47d8-975b-3375bd86817a.__AC_SR200,225___.jpg

    104 Plus GPS Tracker

    https://m.media-amazon.com/images/S/aplus-media-library-service-media/9d46a664-b7f5-4fa5-b111-e4453ef3611e.__AC_SR200,225___.jpg

    DB3 4G OBD GPS Tracker

    Customer Reviews
    ——————
    Price
    ——————
    Capacity
    200 Milliamp Hours — 5000 milliamp hours 10000 milliamp hours 20000 milliamp hours —
    Supported Applications
    GPSLive Gpslive, IOS, Android Gpslive, IOS, Android Gpslive, IOS, Android Gpslive, IOS, Android Gpslive, IOS, Android
    Battery Average Life
    — — 35 days 60 days 120 days —
    Product Dimensions
    5.31 x 2.68 x 0.59 inches — 3.35 x 1.93 x 1.18 inches 4.53 x 2.56 x 1.18 inches 4.53 x 2.56 x 1.85 2.56 x 1.85 x 0.87 inches
    Item Weight
    4.6 ounces — 6 ounces 10 ounces 17 ounces 5 ounces
    DB2-4G GPS Tracker for Vehicles, Free Trial | Real-Time Vehicle Tracking Device, Car, Van, Motorhome, Easy Battery Install, 4G Fleet Tracking, Low Cost Plan & 7-Day Trial

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    • Return for refund within: 30 days
    • Return for replacement within: 30 days
    • This item is covered by PowerixDxz Return Policy

    Manufacturer Contact Info

    LOADING...