Skip to main content
eufy Security Video Doorbell E340 (Battery Powered), Dual Cameras with Delivery Guard, 2K Full HD and Color Night Vision, HomeBase S380 Compatible, No Monthly Fee
  •  
  • $169.99 –
  • Save: 5%
  • $79.99
  • $99.00
  • Save: $19.01 (19%)
  • Free 30-day Returns
  • Price alert
    Shop it at NeweggBusiness.

    ANNKE HD 4K POE Outdoor Surveillance Security Camera Two Way Audio AI Color Night Outdoor IP Network, Bullet Cameras with 4mm Lens, Human&Vehicle Detection, Built-in Microphone, H.265+, 100FT Night Vi

    • 1 Cameras
    • 4 Cameras
    • The 1/2.4 inch progressive scan BSI CMOS image sensor provides 4K resolution (3840 * 2160), with a 16:9 image ratio that perfectly matches the screen.
    • You can use the ANNKE application to help you communicate with friends or family.
    • In the default infrared night vision mode, humans and vehicles trigger and convert vision into color. It also supports switching between infrared night vision and color night vision modes. (100 foot color night vision and infrared night vision)
    • Motion Detection 2.0 can quickly identify and extract key objects such as humans and vehicles, reducing false positives by up to 99%.
    • Sound and light alarms can be associated with event triggers and real-time alerts to prevent and reduce losses in advance; You can choose from 3 flashing modes and adjust the duration as needed.
    • You will only receive an instant alert when a motion event occurs in the custom area. To protect your privacy, you can set a privacy mask. When recording a video, the camera will ignore the obs
    +
    +
    Overview
    Specs
    Reviews

    Any questions? Ask CelesteSM will help you find out quickly.

    Description:
    4K smart bullet network camera with 16:9 image scale
    4mm@F 1.6 lens brings everything back to life
    Efficient H. 265+ compression technology
    Provide real-time security via built-in two-way audio
    Motion detection 2.0 with human & Vehicle Detection
    Smart Dual-Light: advanced technology with long range
    Clear day and night vision with 3D DNR and 120DB WDR
    Support flashing alarm & Audio alarm
    Support on-board storage up to 512 GB (SD card slot)
    IP67 Dust and Waterproof Rating
    Support PoE &DC12V ""
    Camera:
    Image Sensor: 1/ 2.4"" Progressive Scan CMOS
    Max resolution: 3840*2160 (8MP)
    Main Stream: ""50
    Hz: 12.5 fps@3840*2160, 20 fps (3200 × 1800, 2688 × 1520, 1920 × 1080, 1280 × 720)
    60 Hz: 15fps@3840*2160, 20 fps (3200 × 1800, 2688 × 1520, 1920 × 1080, 1280 × 720)""
    Substream: ""50
    Hz: 20 fps (1280 × 720, 640 × 480, 640 × 360)
    60 Hz: 20 fps (1280 × 720, 640 × 480, 640 × 360)""
    Video Compression: ""Main
    stream: H. 265+/H. 265/H. 264+/H. 264
    Sub-stream: H. 265/H. 264/MJPEG""
    Video Bitrate: 32 Kbps - 16 Mbps
    Audio Compression: G. 711/G. 722.1 /G. 726/MP2L2/PCM/AAC-LC
    Audio Input: Built-in Microphone, record with audio
    Audio Output: Built-in Speaker, max
    . sound pressure level: 10 cm: 95 dB
    Lens: 4 mm
    Min.
    Illumination:
    Color: 0.005 Lux @ (F 1.6, AGC ON), B/W: 0 Lux with IR
    Angle of View: Horizontal FOV 78°, vertical FOV 38°, diagonal FOV 96°
    Supplement Light Type: Smart Dual-Light, IR, White Light
    Supplement Light Range: Up to 30 m
    Motion detection 2.0: Supoort, include Human & Vehicle detection
    Flashing Light Alarm: High/Medium/Low Frequency
    Audio Alarm: Warning/Prompt/Custom Audio
    Image Enhancement: BLC, HLC, 3D DNR
    Wide Dynamic Range: 120 dB WDR
    Protocols: TCP/IP, ICMP, DHCP, DNS, HTTP, RTP, RTSP, NTP, IGMP, IPv6, UDP, QoS, FTP, SMTP, UPnP
    API: Open Network Video Interface Version (Profile S, Profile T, Profile G)
    Region of Interest (ROI): 1 fixed region for main stream
    Privacy Mask: 4 programmable polygon privacy masks
    General Function: Rotate mode, mirror, password protection, remote access
    Ethernet: 1 RJ45 10 M/100 M self-adaptive Ethernet port
    General:
    Housing: Metal & Plastic
    Color: White
    Storage: Built-in microSD/SDHC/SDXC Slot, up to 512 GB
    Hardware Reset: Yes
    Operating Power: DC 12 V± 25%, max. 8 W; PoE ( 802.3 af), max. 9.5 W
    Operating Temperature: -22 °F 140 °F/-30 °C 60 °C
    Indoor/Outdoor Use: Indoor/Outdoor
    Interface Protection: IP67
    Dimension (L X W X H): 179 mm × 67.4 mm × 69.1 mm ( 7.1"" × 2.7"" × 2.7"" )
    Weight: 0.6 lb. /285 g

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    Manufacturer Contact Info

    LOADING...