Skip to main content
  • $68.99
  • Free 30-day Returns
  • Price alert
    Shop it at NeweggBusiness.

    Meet Your Seller

    4G GPS Tracker for Vehicles, ST-906L GPS Tracker Locator Real-Time Location Tracking Device with Voice Monitor Car Motorcycle GPS Device for Truck Taxi with No Monthly fee Platform

    Limited time offer, ends 09/29 By JadeEssence Shop

    • 2G+4G NetworkThis 4G GPS vehicle tracker provides nationwide 4G tracking coverage with updates every minute. This motorcycle GPS tracker does not include a SIM card; a local 4G (LTE) network SIM card is required. The ST-906L GPS location tracker consumes approximately 30MB of data monthly. It contains a built-in 180mAh backup battery. When the engine starts, it charges automatically, eliminating concerns about power loss. With SOS Button and Monitor VoiceThis car GPS tracker is equipped with an SOS button and a voice monitoring function. The surrounding sound near the tracker can be listened to on your mobile phone. If the device encounters abnormal conditions, pressing the SOS button sends an SOS message to the guardian and platform while simultaneously calling the guardian. Calling the SIM number in the device results in an automatic answer, enabling you to monitor the audio around the device. Immediate AlertsThis real-time online GPS vehicle tracker supports text message alerts for Movement, SOS alarm, Geo-fence, ACC anti-theft alarm, Speeding, Leaving, Shocking, Low battery, and more. Unlimited GPS tracking historical data is stored during service. Track from any location using free GPS tracking mobile apps that provide real-time text message alerts. This vehicle GPS tracker can retain 2 years of tracking history during service, allowing you to review the historical route at any time
    +
    +
    Overview
    Specs
    Reviews
    avatar

    Any questions? Our AI mode will help you find out quickly.

    2G+4G NetworkThis 4G GPS vehicle tracker provides nationwide 4G tracking coverage with updates every minute. This motorcycle GPS tracker does not include a SIM card; a local 4G (LTE) network SIM card is required. The ST-906L GPS location tracker consumes approximately 30MB of data monthly. It contains a built-in 180mAh backup battery. When the engine starts, it charges automatically, eliminating concerns about power loss. With SOS Button and Monitor VoiceThis car GPS tracker is equipped with an SOS button and a voice monitoring function. The surrounding sound near the tracker can be listened to on your mobile phone.

    If the device encounters abnormal conditions, pressing the SOS button sends an SOS message to the guardian and platform while simultaneously calling the guardian. Calling the SIM number in the device results in an automatic answer, enabling you to monitor the audio around the device. Immediate AlertsThis real-time online GPS vehicle tracker supports text message alerts for Movement, SOS alarm, Geo-fence, ACC anti-theft alarm, Speeding, Leaving, Shocking, Low battery, and more. Unlimited GPS tracking historical data is stored during service. Track from any location using free GPS tracking mobile apps that provide real-time text message alerts.

    This vehicle GPS tracker can retain 2 years of tracking history during service, allowing you to review the historical route at any time

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    Manufacturer Contact Info

    LOADING...