Unmatched Solar-Powered Long-Lasting Performance: Built-in 9000mAh high-capacity rechargeable battery paired with high-efficiency solar panel supports long time non-stop operation. Supports -20 degree to 45 degree wide-temperature charging, works reliably in harsh winter and extreme heat, perfect for year-round outdoor security. ^^ Tool-Free Magnetic Foldable Bracket for 1-Min
Installation: Unique Z-shaped magnetic foldable mount supports 360 degree manual adjustment, enabling magnetic attachment, desktop placement, adhesive mounting, and wall drilling. No complicated wiring, no professional tools needed-install anywhere in seconds, flexible for porch, yard, garage, farm, construction site, and remote locations. ^^ 4G LTE Connectivity with Built-in SIM, No
WiFi Required: Ideal for WiFi-dead zones, rural areas, construction sites, farms, and vacation homes. Stable remote live view, instant alerts, and two-way talk anytime, anywhere without network limitations.
(Notice: The SIM card supports AT&T, T-Mobile, and Verizon major carriers. Standard monthly data plan fees apply, paid directly to your selected mobile carrier for ongoing internet access. ) ^^ Smart AI Detection & Accurate Alert System: Advanced AI algorithm supports human detection, vehicle detection, and motion detection, greatly reducing false alerts from falling leaves, small animals, or light changes. Instant app push notifications, siren alarm, and white light flashing to deter intruders effectively, ensuring you never miss critical events. ^^ Crystal 1080P
Imaging & Versatile Night Vision: 2MP ultra-low-light sensor with 1920x1080 resolution delivers sharp day footage. Three night vision modes - full-color, infrared black-and-white, and smart auto-switch - provide clear visibility up to 10m (IR) and 6m (white light), enhances image quality even in strong reflection or low-light environments. ^^ Multiple Recording Modes & Flexible StorageFeatures Normal, AOR continuous recording, Smart, Power-Saving, and Expert modes. Exclusive AOR mode switches between low/high frame rate automatically to balance battery life and full-event recording. Supports up to 512GB Micro SD card (NOT included), cloud storage (subscription required after 90 days free trial). ^^
Rich Functions & All-Weather Durability: Built-in 2W high-power speaker for full-duplex two-way intercom with echo cancellation. Supports time-lapse video, custom voice messages, and electronic fence. IP65 waterproof, dustproof, and surge protection withstands rain, snow, wind, and dust, built for long-term outdoor use.